RAD Data comm HCD-E1 Spécifications

Naviguer en ligne ou télécharger Spécifications pour Mise en réseau RAD Data comm HCD-E1. RAD Data comm HCD-E1 Specifications [en] [it] Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 150
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
LRS-24
12-slot Link Access Rack with SNMP
Version 3.00
Installation and Operation Manual
Notice
This manual contains information that is proprietary to RAD Data Communications. No part of this
publication may be reproduced in any form whatsoever without prior written approval by RAD Data
Communications.
No representation or warranties for fitness for any purpose other than what is specifically mentioned in
this manual is made either by RAD Data Communications or its agents.
For further information contact RAD Data Communications at the address below or contact your local
distributor.
RAD Data Communications
Headquarters
12 Hanechoshet Street
Tel Aviv 69710 Israel
Tel: 972-3-6458181
Fax: 972-3-6498250
RAD Data Communications
US East
900 Corporate Drive
Mahwah, NJ 07430 USA
Tel: (201) 529-1100
Fax: (201) 529-5777
RAD Data Communications
US West
3631 South Harbor Boulevard
Suite 250
Santa Ana, CA 92704
Tel: (714) 850-0555
Fax: (714) 850-1555
© 2000 RAD Data Communications Publication No. 695-211-08/00
Order from: Cutter Networks
Ph:727-398-5252/Fax:727-397-9610
www.bestdatasource.com
Vue de la page 0
1 2 3 4 5 6 ... 149 150

Résumé du contenu

Page 1 - Version 3.00

LRS-2412-slot Link Access Rack with SNMPVersion 3.00Installation and Operation ManualNoticeThis manual contains information that is proprietary to RAD

Page 2

Table of Contentsii LRS-24 Installation and Operation Chapter 3. Management via the CM-1 Module3.1 Introduction...

Page 3 - Warranty

Appendix C SNMP Management LRS-24 Installation and Operation ManualC-6 IP EnvironmentNet and Subnet MasksNet and subnet masks are used to help filter

Page 4 - Telecommunication Safety

LRS-24 Installation and Operation Manual Appendix C SNMP ManagementSNMP Traps C-7Routing of IP Management TrafficThe routing of SNMP messages is made

Page 5 - Regulatory Information

Appendix C SNMP Management LRS-24 Installation and Operation ManualC-8 SNMP TrapsOrder from: Cutter NetworksPh:727-398-5252/Fax:727-397-9610www.bestd

Page 6 - Declaration of Conformity

Defining Dial-Up Modem Parameters D-1Appendix DCM-2 ManagementCommandsThis appendix describes the set of commands recognized by the CM-2 module.It exp

Page 7 - Quick Start Guide

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-2 Defining Dial-Up Modem ParametersD.1 Defining Dial-Up Modem Paramete

Page 8 - 2. LRS-24 with CM-2 Module

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsDefining Dial-Up Modem Parameters D-3Command FieldsTable D-1 lists the fi

Page 9 - Contents

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-4 Defining LRS-24 And CM-2 SNMP Agent ParametersTable D-1. DEF CALL Fi

Page 10 - Table of Contents

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsDefining LRS-24 And CM-2 SNMP Agent Parameters D-53. Press <Tab> t

Page 11 - List of Figures

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-6 Defining LRS-24 And CM-2 SNMP Agent ParametersTable D-2. DEF HUB Com

Page 12 - List of Tables

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsDefining LRS-24 And CM-2 SNMP Agent Parameters D-7Table D-3 DEF HUB Com

Page 13 - Introduction

Table of ContentsLRS-24 Installation and Operation iii Appendix A. Connector Wiring Appendix B. LRS-PS-FEED Power Supply Appendix C. SNMP Management A

Page 14 - Management/CM-2 functions

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-8 Defining CM-2 Download ParametersD.3 Defining Management StationsPur

Page 15 - Application

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsDefining CM-2 Download Parameters D-9D.4 Defining CM-2 Download Paramete

Page 16 - Features

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-10 Defining CM-2 Download ParametersTable D-4. Download Main Menu Opti

Page 17 - Overview 1-5

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsDefining CM-2 Download Parameters D-11CM2 Download via XMODEMIn this opti

Page 18 - 1.2 Physical Description

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-12 Defining CM-2 Download ParametersCHANGE CM2 SOFTWARE VERSIONCM2 cont

Page 19 - Front View

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsDefining Modem Download Parameters D-13VIEW CM2 SOFTWARE VERSIONCM2 conta

Page 20 - LRS-24 Front Section

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-14 Defining Modem Download ParametersMODEM DOWNLOAD MAIN MENU1. Modem D

Page 21 - LRS-24F Enclosure

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsDefining Modem Download Parameters D-15MODEMS DOWNLOAD via CM2 FLASHCM2 c

Page 22 - LRS-24 Module Slots

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-16 Defining Modem Download ParametersChanging Modem Version➤ To change

Page 23 - 1.3 Functional Description

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsViewing Modem Version D-17D.6 Viewing Modem VersionPurposeViews current

Page 24 - Common Logic Modules

Table of Contentsiv LRS-24 Installation and OperationList of Tables2-1. PS Modules, Front Panel Indicators...

Page 25 - Management

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-18 Defining I/O Module Management ParametersD.7 Defining I/O Module Ma

Page 26 - 1.4 Technical Specifications

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsDefining Card Configuration D-19D.8 Defining Card ConfigurationPurposeDe

Page 27 - CM-2 Management Interface

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-20 Defining I/O Module Operational ParametersA card containing four mod

Page 28 - Environment

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsDefining Supervision Terminal Type D-21MODEM SETUPMODEM NAME: ASMI-31CQ(m

Page 29 - Installation and Setup

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-22 Defining Supervision Terminal Type• Move cursor to the right by one

Page 30 - 2-2 Introduction

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsDefining I/O Module Diagnostics D-23D.11 Defining I/O Module Diagnostics

Page 31 - LRS-24B SIDE VIEW

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-24 Defining Auto-ConfigurationD.12 Defining Auto-ConfigurationPurposeD

Page 32 - Grounding

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsDefining Auto-Configuration D-25Editing the ConfigurationYou can edit exi

Page 33 - 2.3 Unpacking the Chassis

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-26 Defining Auto-ConfigurationHub Configuration OperationsYou can send

Page 34 - 2.4 Installation and Setup

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsDefining Auto-Configuration D-27Send process: [size] byte transferredThe

Page 35 - Installation and Setup 2-7

Overview 1-1Chapter 1IntroductionThis chapter describes the basic physical and functional features of the LRS-24modem rack, as well as some typical ap

Page 36 - CM-1 Module

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-28 Defining Auto-Configuration4. Press <Enter> to continue.The t

Page 37 - Installation and Setup 2-9

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsDefining Auto-Configuration D-29AUTO-CONFIGURATION ACCORDING TO MODEM TYP

Page 38 - Internal Jumpers

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-30 Defining Auto-ConfigurationAUTO-CONFIGURATION ACCORDING TO SLOT/MODE

Page 39 - Installation and Setup 2-11

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsDefining Auto-Configuration D-31Sending Configuration Files➤ To send a c

Page 40 - CM-2 Module

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-32 Defining Auto-ConfigurationCreating Files from an Existing Configura

Page 41

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsDisplaying General Alarm Status D-33VIEW CONFIGURATION FILES IN HUBModem

Page 42 - 2-14 Installation and Setup

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-34 Displaying General Alarm StatusHUB ALARMPOWER SUPPLY A: FAILPOWER SU

Page 43 - CM-2 Installation

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsDisplaying I/O Module Alarm Status D-35D.14 Displaying I/O Module Alarm

Page 44 - PS Interface Modules

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-36 Displaying System StatusMODEM ALRAM STATUSMODEM NAME: ASMI-31CQ(m)DE

Page 45 - LRSI-F-CM1

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsDisplaying System Status D-37LRS-24 CARDS (Device name – LRS-12)SLOT NO.

Page 46 - Interface Module Installation

Chapter 1 Introduction LRS-24 Installation and Operation Manual1-2 OverviewManagement/CM-2 functionsLRS-24 is managed by a UNIX-based or PC-based SNM

Page 47 - LINK Link Connection is made

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-38 Displaying Alarms LogD.16 Displaying Alarms LogPurposeDisplays the

Page 48 - Alarm Relay

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsDisplaying I/O Module Status D-39D.17 Displaying I/O Module StatusPurpos

Page 49 - LRSI-F-2-CM2 10B2 Front Panel

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-40 Define PasswordD.18 Define CM-2 ResetPurposeRemote reset for CM-2 c

Page 50 - LRSI-F-2-CM2

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsDisplaying Command Options D-41 PASSWORD MENUEnter new password : radl

Page 51

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-42 Displaying Command OptionsHUB TERMINAL COMMANDSDEF TST – MODEM DIAGN

Page 52 - LRS-24 Enclosure

LRS-24 Installation and Operation Manual Appendix D CM-2 Management CommandsDisplaying Command Options D-43Table D-9. Hub Terminal Commands ScreenCo

Page 53 - DC Power Connection

Appendix D CM-2 Management Commands LRS-24 Installation and Operation ManualD-44 Displaying Command OptionsOrder from: Cutter NetworksPh:727-398-5252

Page 54 - Station Clock Connections

I-1Index—A—Abstract Syntax Notation 1 (ASN.1), C-2, C-3AC module, 1-12, 2-16Address Resolution Protocol (ARP), C-7alarms, 1-5, 2-26, 4-7, 4-12, 5-1, C

Page 55 - LRS-24 with CM-1 Module

Index LRS-24 Installation and Operation ManualI-2—E—enclosure, installation, 2-24–2-27error code, 2-29errors, 2-29, 4-11, 4-12Ethernet, 1-5, 1-13, 1-1

Page 56 - LRS-24 with CM-2 Module

LRS-24 Installation and Operation Manual IndexI-3—N—network management station, RADview, 4-1node ID, CM-2, 4-11node number, 3-1, 4-4, 4-11, 4-15, D-18

Page 57 - Troubleshooting

LRS-24 Installation and Operation Manual Chapter 1 IntroductionOverview 1-3Power SuppliesLRS-24 operates with single or dual, AC or DC power supplies

Page 58

Index LRS-24 Installation and Operation ManualI-4Order from: Cutter NetworksPh:727-398-5252/Fax:727-397-9610www.bestdatasource.com

Page 59 - Management via the CM-1

Chapter 1 Introduction LRS-24 Installation and Operation Manual1-4 OverviewLRS-24LRS-24Local SNMPManagementStationCentralManagementStationADM or Fram

Page 60 - 3.2 Hardware Requirements

LRS-24 Installation and Operation Manual Chapter 1 IntroductionOverview 1-5Remote ManagementThe modem cards in the LRS-24 can be remotely managed by

Page 61 - Terminal

Chapter 1 Introduction LRS-24 Installation and Operation Manual1-6 Physical Description1.2 Physical DescriptionChassis DescriptionThere are two diff

Page 62 - Configuring the Terminal

LRS-24 Installation and Operation Manual Chapter 1 IntroductionPhysical Description 1-7ORear ViewFront View Figure 1-3. LRS-24B 3-D ViewFigure 1-4

Page 63 - NODE nn DEF PWD

Order from: Cutter NetworksPh:727-398-5252/Fax:727-397-9610www.bestdatasource.com

Page 64

Chapter 1 Introduction LRS-24 Installation and Operation Manual1-8 Physical DescriptionLRS-24B Rear SectionLRS-24 Front SectionInterface ModulesPower

Page 65 - Management via the CM-2

LRS-24 Installation and Operation Manual Chapter 1 IntroductionPhysical Description 1-9LRS-24F ETSI UNITLRS-24F is a modular chassis suitable for ins

Page 66 - CM-2 Functions

Chapter 1 Introduction LRS-24 Installation and Operation Manual1-10 Physical DescriptionInterface ModulesPower Supply(PS)CONTROL LOGICModuleUser Modu

Page 67 - Introduction 4-3

LRS-24 Installation and Operation Manual Chapter 1 IntroductionFunctional Description 1-11Internal Modulesfor User ModulesInternal Modules forSystem

Page 68 - Management Priorities

Chapter 1 Introduction LRS-24 Installation and Operation Manual1-12 Functional Description• DC power supply module, PS-LRS/48 – operates on –48 VDC,

Page 69 - Initializing CM-2

LRS-24 Installation and Operation Manual Chapter 1 IntroductionFunctional Description 1-13ManagementCM-1 Management CapabilitiesAn ASCII terminal can

Page 70 - 4.2 Hardware Requirements

Chapter 1 Introduction LRS-24 Installation and Operation Manual1-14 Technical SpecificationsMBEMBELRS-24LRS-24ManagementStationSupervisionTerminalLRS

Page 71 - Terminal Connection Methods

LRS-24 Installation and Operation Manual Chapter 1 IntroductionTechnical Specifications 1-15External Clock InterfaceT1 ModeTypeT1Clock Rate1.544 MHzL

Page 72 - 4-8 Hardware Requirements

Chapter 1 Introduction LRS-24 Installation and Operation Manual1-16 Technical SpecificationsHardwareEthernet 10BaseT interface for UTP and STP mediaE

Page 73 - Hardware Requirements 4-9

Introduction 2-1Chapter 2Installation and SetupThis chapter provides installation and operation instructions for the LRS-24 system,and the basic syste

Page 74 - 4-10 Hardware Requirements

WarrantyThis RAD product is warranted against defects in material and workmanship for a period of one yearfrom date of shipment. During the warranty p

Page 75 - Command Protocol

Chapter 2 Installation and Setup LRS-24 Installation and Operation Manual2-2 Introduction Figure 2-1. LRS-24F Mechanical DiagramOrder from: Cutter

Page 76 - Index of Commands

LRS-24 Installation and Operation Manual Chapter 2 Installation and SetupIntroduction 2-3LRS-24B FRONT VIEW WITHOUT MODULESLRS-24B TOP VIEWLRS-24B S

Page 77

Chapter 2 Installation and Setup LRS-24 Installation and Operation Manual2-4 Site Requirements and Prerequisites2.2 Site Requirements and Prerequisi

Page 78 - BY PASS PASS WORD

LRS-24 Installation and Operation Manual Chapter 2 Installation and SetupUnpacking the Chassis 2-5For your safety, always disconnect all the cables c

Page 79

Chapter 2 Installation and Setup LRS-24 Installation and Operation Manual2-6 Installation and Setup4. Check the packing list against your order to e

Page 80

LRS-24 Installation and Operation Manual Chapter 2 Installation and SetupInstallation and Setup 2-7LRS-24PS-LRS/230/115PS-LRS48VDCLRS-24DC Power Supp

Page 81 - Diagnostics

Chapter 2 Installation and Setup LRS-24 Installation and Operation Manual2-8 Installation and SetupPS Module Installation➤ To install the first PS m

Page 82 - Status/Address

LRS-24 Installation and Operation Manual Chapter 2 Installation and SetupInstallation and Setup 2-9POWERTDRDMANAGEMENTRS232CM-1 Figure 2-4. Module

Page 83 - Table 5-2. Error Messages

Chapter 2 Installation and Setup LRS-24 Installation and Operation Manual2-10 Installation and SetupInternal JumpersFigure 2-5 shows the location of

Page 84 - 5-4 Error Messages

LRS-24 Installation and Operation Manual Chapter 2 Installation and SetupInstallation and Setup 2-11Table 2-3. Module CM-1 Jumper SettingsJumpers De

Page 85 - Connector Wiring

Safety WarningsSEE INSTALLATION INSTRUCTIONS BEFORE CONNECTING TO THE SUPPLY!The exclamation point within a triangle is intended to warn the operator

Page 86

Chapter 2 Installation and Setup LRS-24 Installation and Operation Manual2-12 Installation and SetupCM-1 Installation Procedure➤ To install CM-1:•

Page 87

LRS-24 Installation and Operation Manual Chapter 2 Installation and SetupInstallation and Setup 2-13Table 2-4. Module CM-2, Front PanelIndicator Fun

Page 88 - A.7 Power Connectors

Chapter 2 Installation and Setup LRS-24 Installation and Operation Manual2-14 Installation and SetupJ5J7E175E1120T1100JP2JP7JP6JP5JP4JP9JP3JP1JP8GND

Page 89 - LRS-PS-FEED Power Supply

LRS-24 Installation and Operation Manual Chapter 2 Installation and SetupInterfaces and Connections 2-15Table 2-5. Module CM-2 Jumper SettingsJumper

Page 90 - B.3 Site Requirements

Chapter 2 Installation and Setup LRS-24 Installation and Operation Manual2-16 Interfaces and ConnectionsPS Interface ModulesThis section explains the

Page 91 - Ambient Requirements

LRS-24 Installation and Operation Manual Chapter 2 Installation and SetupInterfaces and Connections 2-17LRSI-F-PSP/230/115PHANTOM POWER150VLRSI-F-PS/

Page 92 - Preparation for Installation

Chapter 2 Installation and Setup LRS-24 Installation and Operation Manual2-18 Interfaces and ConnectionsLRSI-F-CM1STATIONCLKMANAGEMENTRS232 Figure 2

Page 93 - Operation

LRS-24 Installation and Operation Manual Chapter 2 Installation and SetupInterfaces and Connections 2-19LRSI-F-1-CM210BTACTLINKLRSI-B-1-CM210BTACTLIN

Page 94

Chapter 2 Installation and Setup LRS-24 Installation and Operation Manual2-20 Interfaces and ConnectionsLRSI-F-1-CM2 Internal SettingsFigure 2-11 sho

Page 95 - SNMP Management

LRS-24 Installation and Operation Manual Chapter 2 Installation and SetupInterfaces and Connections 2-21Table 2-8. LRSI-F-1-CM2 Module Jumper Settin

Page 96 - MIB Structure

Additional conditions concerning the safety of connection to telecommunication networks:• The unit must be earthed prior to connection to telecommuni

Page 97 - Management Domains Under SNMP

Chapter 2 Installation and Setup LRS-24 Installation and Operation Manual2-22 Interfaces and ConnectionsLRSI-F-2-CM2STATIONCLKETHERNETMANAGEMENT10B2

Page 98 - C.3 IP Environment

LRS-24 Installation and Operation Manual Chapter 2 Installation and SetupInterfaces and Connections 2-23Connect MajorAlarm RelayConnect MinorAlarm Re

Page 99 - IP Environment C-5

Chapter 2 Installation and Setup LRS-24 Installation and Operation Manual2-24 Interfaces and ConnectionsLRSI-F-2-CM2 Installation➤ To install the LR

Page 100 - Default Gateway

LRS-24 Installation and Operation Manual Chapter 2 Installation and SetupInterfaces and Connections 2-25AC Power Connection➤ To connect LRS-24 to AC

Page 101 - C.4 SNMP Traps

Chapter 2 Installation and Setup LRS-24 Installation and Operation Manual2-26 Interfaces and ConnectionsThe external feed voltage passes through the

Page 102 - C-8 SNMP Traps

LRS-24 Installation and Operation Manual Chapter 2 Installation and SetupInitial Operation and Basic Checks 2-27 Table 2-11 lists the supervisory cab

Page 103 - CM-2 Management

Chapter 2 Installation and Setup LRS-24 Installation and Operation Manual2-28 Initial Operation and Basic Checks• I/O Module(s): Refer to the Instal

Page 104 - Procedure

LRS-24 Installation and Operation Manual Chapter 2 Installation and SetupInitial Operation and Basic Checks 2-29Normal Indications• PS Module(s): Al

Page 105 - Command Fields

Chapter 2 Installation and Setup LRS-24 Installation and Operation Manual2-30 Initial Operation and Basic ChecksIf these checks do not correct the pr

Page 106

Introduction 3-1Chapter 3Management via the CM-1ModuleThis chapter provides information on the management of LRS-24 enclosuresequipped with CM-1 contr

Page 107

Declaration of ConformityManufacturer’s Name: RAD Data Communications Ltd.Manufacturer’s Address: 12 Hanechoshet St.Tel Aviv 69710Israeldeclares that

Page 108 - Order from: Cutter Networks

Chapter 3 Management via the CM-1 Module LRS-24 Installation and Operation Manual3-2 Hardware Requirements3.2 Hardware RequirementsTerminal Characte

Page 109 - 1, 2, 3, 4, 6, 8, 10, 15, 20

LRS-24 Installation and Operation Manual Chapter 3 Management via the CM-1 ModuleHardware Requirements 3-3This section presents typical methods for t

Page 110

Chapter 3 Management via the CM-1 Module LRS-24 Installation and Operation Manual3-4 Operating the CM-1 Supervision TerminalManagementRS-232LRS-24Sup

Page 111

LRS-24 Installation and Operation Manual Chapter 3 Management via the CM-1 ModuleOperating the CM-1 Supervision Terminal 3-54. Connect the communica

Page 112 - CM2 Download via LAN

Chapter 3 Management via the CM-1 Module LRS-24 Installation and Operation Manual3-6 Operating the CM-1 Supervision TerminalOrder from: Cutter Networ

Page 113 - Change CM-2 Software Version

Introduction 4-1Chapter 4Management via the CM-2ModuleThe information presented in this chapter includes:• CM-2 functions• Description of supervisio

Page 114 - View CM-2 Software Version

Chapter 4 Management via the CM-2 Module LRS-24 Installation and Operation Manual4-2 IntroductionAfter performing the preliminary configuration, you

Page 115

LRS-24 Installation and Operation Manual Chapter 4 Management via the CM-2 ModuleIntroduction 4-3• Identification of Failures – automatically identi

Page 116 - Modem Download via CM2 FLASH

Chapter 4 Management via the CM-2 Module LRS-24 Installation and Operation Manual4-4 IntroductionThe CM-2 module also includes the functions required

Page 117

LRS-24 Installation and Operation Manual Chapter 4 Management via the CM-2 ModuleIntroduction 4-5Preliminary Configuration of CM-2 module• Configura

Page 118 - Changing Modem Version

LRS-24 with CM-2 Module 1Quick Start GuideIf you are familiar with LRS-24, use this guide to prepare it for operation. Choosethe section appropriate t

Page 119 - D.6 Viewing Modem Version

Chapter 4 Management via the CM-2 Module LRS-24 Installation and Operation Manual4-6 Hardware RequirementsModules without Internal AgentThe CM-2 modu

Page 120

LRS-24 Installation and Operation Manual Chapter 4 Management via the CM-2 ModuleHardware Requirements 4-7Modules must be initialized properly to ens

Page 121

Chapter 4 Management via the CM-2 Module LRS-24 Installation and Operation Manual4-8 Hardware RequirementsSupervisionTerminalManagementRS-232LRS-24

Page 122

LRS-24 Installation and Operation Manual Chapter 4 Management via the CM-2 ModuleHardware Requirements 4-9SupervisoryManagementTerminalSlipManagement

Page 123

Chapter 4 Management via the CM-2 Module LRS-24 Installation and Operation Manual4-10 Hardware RequirementsManagementStationEthernetInterfaceEthernet

Page 124

LRS-24 Installation and Operation Manual Chapter 4 Management via the CM-2 ModuleCM-2 Supervision Terminal Language 4-114.3 CM-2 Supervision Termina

Page 125 - Purpose

Chapter 4 Management via the CM-2 Module LRS-24 Installation and Operation Manual4-12 CM-2 Supervision Terminal LanguageScrolling Values When a field

Page 126

LRS-24 Installation and Operation Manual Chapter 4 Management via the CM-2 ModuleSupervision Terminal Operating Instructions 4-13Table 4-2. Terminal

Page 127 - Editing the Configuration

Chapter 4 Management via the CM-2 Module LRS-24 Installation and Operation Manual4-14 Supervision Terminal Operating InstructionsChanging the Passwor

Page 128 - Hub Configuration Operations

LRS-24 Installation and Operation Manual Chapter 4 Management via the CM-2 ModuleSupervision Terminal Operating Instructions 4-15➤ To configure an S

Page 129 - Editing a Modem File

Quick Start Guide LRS-24 Installation and Operation Manual2 LRS-24 with CM-2 Module2. LRS-24 with CM-2 ModuleThis section contains the startup instru

Page 130

Chapter 4 Management via the CM-2 Module LRS-24 Installation and Operation Manual4-16 Supervision Terminal Operating InstructionsIf it is necessary t

Page 131

Troubleshooting 5-1Chapter 5Troubleshooting andDiagnosticsThis chapter describes alarms, diagnostic tests and troubleshooting for the LRS-24system.5.1

Page 132

Chapter 5 Troubleshooting and Diagnostics LRS-24 Installation and Operation Manual5-2 Error MessagesStatus/AddressDisplayE1 Figure 5-1. Error Indic

Page 133 - Sending Configuration Files

LRS-24 Installation and Operation Manual Chapter 5 Troubleshooting and DiagnosticsError Messages 5-3Table 5-2. Error MessagesMessage Interpretation*

Page 134

Chapter 5 Troubleshooting and Diagnostics LRS-24 Installation and Operation Manual5-4 Error MessagesOrder from: Cutter NetworksPh:727-398-5252/Fax:72

Page 135

Station Clock Interface – LRSI-F-CM1 Module A-1Appendix AConnector WiringThis appendix provides connector information on:• CM-1 module• CM-2 module•

Page 136 - Display Format

Appendix A Connector Wiring LRS-24 Installation and Operation ManualA-2 Management RS-232 Port Interface—CM-1/CM-2 ModulesA.2 Management RS-232 Port

Page 137

LRS-24 Installation and Operation Manual Appendix A Connector WiringStation CLK Connector – LRSI-F-CM2 Modules A-3Table A-3. Pin Allocation for Mana

Page 138 - D-36 Displaying System Status

Appendix A Connector Wiring LRS-24 Installation and Operation ManualA-4 Power ConnectorsA.5 Ethernet Interface Connector – LRSI-F1-CM2 ModuleThe 10B

Page 139 - Displaying System Status D-37

LRS-PS-FEED Panels B-1Appendix BLRS-PS-FEED Power SupplyB.1 Functional DescriptionLRS-PS-FEED is a standalone power supply unit designed to serve as

Page 140 - D.16 Displaying Alarms Log

LRS-24 Installation and Operation iContents Chapter 1. Introduction1.1 Overview ...

Page 141

Appendix B LRS-PS-FEED Power Supply LRS-24 Installation and Operation ManualB-2 Site RequirementsFigure B-1. AC-Powered LRS-PS-FEED Front PanelFigur

Page 142 - D.19 Define Password

LRS-24 Installation and Operation Manual Appendix B LRS-PS-FEED Power SupplySite Requirements B-3DC PowerDC-powered LRS-PS-FEED units require a –48 V

Page 143

Appendix B LRS-PS-FEED Power Supply LRS-24 Installation and Operation ManualB-4 Installation and OperationB.4 Installation and OperationPreparation

Page 144

LRS-24 Installation and Operation Manual Appendix B LRS-PS-FEED Power SupplyInstallation and Operation B-5Rack InstallationPosition the LRS-PS-FEED u

Page 145

Appendix B LRS-PS-FEED Power Supply LRS-24 Installation and Operation ManualB-6 Installation and OperationOrder from: Cutter NetworksPh:727-398-5252/

Page 146

SNMP Environment C-1Appendix CSNMP ManagementC.1 ScopeThis appendix:• Provides specific information required to manage LRS-24 (equipped with theCM-2

Page 147

Appendix C SNMP Management LRS-24 Installation and Operation ManualC-2 SNMP EnvironmentGetNextRequest Command for retrieving sequentially specific ma

Page 148

LRS-24 Installation and Operation Manual Appendix C SNMP ManagementSNMP Environment C-3MIBs Supported by the LRS-24 SNMP AgentThe interpretation of t

Page 149

Appendix C SNMP Management LRS-24 Installation and Operation ManualC-4 IP EnvironmentCM-2 CommunitiesThe SNMP agent of the CM-2 can use and recognize

Page 150

LRS-24 Installation and Operation Manual Appendix C SNMP ManagementIP Environment C-5An IP address is logically divided into two main portions:• Net

Commentaires sur ces manuels

Pas de commentaire