FOM-40 Installation and Operation Manual Chapter 5 Troubleshooting and Diagnostics
Internal BERT 5-5
Modem Self-Test
The modem self-test checks that the modem is operating correctly (see Figure 5-4).
Pattern
Generator
PATT
Pressed
ANA
Pressed
Transmitter
Receiver
FOM-40
Pattern
Tester
ERR
Figure 5-4. Modem Self-Test
To perform the modem self-test:
1. Press the ANA pushbutton on the front panel.
The TEST and DCD LEDs light.
If the DCD indicator does not light, verify that the DCD switch SW5/8 is set to ON,
or that the RTS signal is High.
2. Press the PATT pushbutton. Verify that:
DCD and TEST LEDs are ON.
ERR LED blinks once.
Continuous errors cause the ERR LED to light and stay lit, intermittent errors
cause ERR to blink. FOM-40 is faulty and should be replaced.
3. To stop the test, restore all pushbuttons to their normal positions.
Two-BER Test
The Two-BER Test checks the link between the units (see Figure 5-5).
To perform the two-BER test:
Press the PATT button on both devices.
Continuous errors cause the ERR LED to light and stay lit, intermittent errors
cause ERR to blink. FOM-40 is faulty and should be replaced.
For correct operation of the BER Test, the DCD switch (SW5/8) must be set to OFF
or the RTS signal must be High.
When the PATT pushbutton is pressed, the external BERT is effectively disconnected.